It will be necessary to close the N74 Tipperary to Cashel Road between Tipperary Town and Golden daily between 7:00am and 7:00pm from Monday 15th October to Friday 19th October in order to facilitate Resurfacing Works over a 1.7km length of the N74 between the Cemex Quarry at Knockballynoe and Kilfeacle Village. Traffic travelling between Tipperary Town and Cashel will be diverted at Tipperary Town onto R661 to Dundrum and then onto R505 to Cashel (and vice versa). Traffic joining the N74 between Cashel and Golden and travelling to Tipperary Town will be diverted at Golden onto Local Road LP1301 and LP1317 to join the R505 at Knockavilla and onto Tipperary Town on R661.

Diversion routes will be signed. (PDF Logo 665 kbs) N74 Route Diversion

Roadworks without road closure will continue for a further 2 weeks until Friday 2ndNovember under traffic lights.

The Roads Section regrets any inconvenience that may be caused by this necessary roads infrastructure work.

Advertisements